MG Engineering Inc. (MG) is a Multi-Disciplinary
Engineering Design Company which has been operating
internationally since 2002.
Below is a list of MG Engineering Mining and Industrial Projects.
|
Bus Bar Seismic Restraint
2010
(Canexus Chemicals, North Vancouver, BC)
MG completed the detailed design for the bus bar seismic restraints for the Canexus TCP project in North Vancouver.
The restraints consisted of cables with insulators, and rigid supports where cables could not be placed on both sides.
____________________________________________________________________________________________
HCl Storage Scrubber UPgrade
2010
(Canexus Chemicals - North Vancouver, BC)
MG completed detailed design for the installation of 2 Fume Scrubbers and related piping.
The objective of this project was to was to provide provide continuous scrubbing ability for their (4) HCl Storage Tanks
& Truck Loading Station by installing 2 fume scrubbers and a three way valve switching station.
____________________________________________________________________________________________
Standby Pumps Installation
2010
(Canexus Chemicals - North Vancouver, BC)
MG completed detailed design for the installation of 12 standby pumps, related piping, pipe bridge and equipment
pads.
The objective of this project was to provide continuous pumping due to pump failure,
____________________________________________________________________________________________
Erco Feed Back-UP System
2010
(Canexus Chemicals - North Vancouver, BC)
MG completed detailed design for the installation of the Erco Feed Back-Up System.
The objective of this project was to was to provide the adjacent Sodium Chlorate Plant filtered brine,
while Canexus in their annual maintenance shutdown. The project included the installation of a pump,
related piping, pipe bridge and equipment pad.
____________________________________________________________________________________________
Modification to Caustic Railcar Loading Ramps
2010
(Canexus Chemicals - North Vancouver, BC)
MG completed detailed design for widening the Caustic Railcar Loading Ramps.
The objective of this project was to improve the loading at (3) Caustic Railcar loading stations.
The project included installing (3) 4 feet wide ramps, modifying platform steel and piping.
____________________________________________________________________________________________
Hydrogen Analyzer Re-Deployment
2010
(Canexus Chemicals - North Vancouver, BC)
MG completed detailed design for installation of the Hydrogen Analyzer Re-deployment
The objective of this project was to provide continuous sampling of the chlorine off gas for presence
of hydrogen from the Electroylzers.
The project included the installation of (14) titanium sample coolers, relocating (7) pressure gauges, installing
sample tubing, and instrument air for sample cooling.
____________________________________________________________________________________________
Plant Drainage
2010
(Canexus Chemicals - North Vancouver, BC)
MG completed detailed design and assisted with construction for Plant Drainage in between the Cell Room and the
Brine Area. The objective of this project was to improve drainage of rain water.
____________________________________________________________________________________________
Canexus Salt Pad Project
2010
(Canexus Chemicals - North Vancouver, BC)
MG completed the detailed design and assisted the Canexus Plant in North Vancouver with construction management
of the first phase of the expansion of their raw salt storage capacity. This project consisted of installing new
‘lock block’ retaining walls on the south and east sides of the salt pad. The lock blocks were tied in to existing
walls with short sections of new cast in place concrete retaining walls. The project also included some demolition
of existing structures and piping, some new piping, platform re-design, a drainage system, fence relocation, asphalt
paving, and the installation of a new power pole.
____________________________________________________________________________________________
Caustic Railcar Loading Automation
2009
(Canexus Chemicals - North Vancouver, BC)
MG completed detailed design for the Caustic Railcar Loading Automation.
The objective of this project was to
improve Caustic Railcar Loading.
The Project included installing two mag meters and three automatic on/off
valves and related piping.
____________________________________________________________________________________________
FLY ASH HANDLING PROJECT 2009
(Capital Power Corporation -
Williams Lake Power Plant, BC)
MG Engineering was hired by Capital Power Corporation (CPC) to study options to improve/replace
the current problematic fly ash handling system at the Williams Lake Power Plant.
Read more
____________________________________________________________________________________________
AMBATOVY ORE SLURRY PIPELINE
2008
(Ambatovy Minerals, SA - Madagascar)
MG acted as a subcontractor to PSI Inc., (Concord, CA.) to provide civil/structural
design services for this large 42m x65m pump station in Madagascar
.
Read more
____________________________________________________________________________________________
PERSEVERANCE
(Xstrata - Matagami, Quebec)
MG acted as subcontractor to PSI Inc. (Concord, CA.) to provide hydraulic, civil and mechanical design
.
Read more
____________________________________________________________________________________________
PIPELINES 2008
(Galore Creek Mining Corporation (Galore Creek Projects) - Vancouver, BC)
MG assisted PSI with a conceptual study for new options for the
mine. Previously, MG assisted PSI with the preliminary design
of the diesel supply, mine concentrate, tailings and ore pipelines.
____________________________________________________________________________________________

HYDROCHLORIC RAILCAR ACID LOADING FACILITY 2008
(Canexus Chemicals Canada LP - North Vancouver, BC)
The acid railcar loading project consisted of the design and installation of a new stand-alone railcar loading platform, located to the north of the existing loading bays. The project included a siding extension to the south, which combined with the new loading station, allows increased caustic and acid railcar loading capabilities.
Read more
___________________________________________________________________________________________
TAILINGS LINES 2007
(Agnico - Eagle Mines Limited (Goldex Project) - Val-D'or,
Quebec)
MG is assisting PSI in the preliminary and detailed design of a
5 kilometre and 20 kilometre tailings system for
the Goldex Mine
in North-western Quebec.
____________________________________________________________________________________________
STRIPPER HEAT RECOVERY 2007
(Canexus Chemicals - North Vancouver, BC)
MG completed the detailed mechanical and structural design for
the heat exchanger installations on this project.
____________________________________________________________________________________________

PEAT DEWATERING 2007
(Barrick Gold/ Westmar - Alaska, USA)
This project involved budget development work for a proposed gold mine in a remote area of Alaska. The mine location was distant from power utilities, oil pipelines and other possible sources of energy.
Read more
____________________________________________________________________________________________
ALUMINA CONCENTRATE PIPELINE STUDY 2006
(PSI / Bechtel Corporation - Brisbane, Australia)
MG participated in a preliminary engineering study estimating
the cost of a 400 kilometre alumina concentrate pipeline in
South East Asia.
____________________________________________________________________________________________
ALTERNATE TAILINGS HANDLING STUDY 2006
(Western Canadian Coal Company - Tumbler Ridge, BC)
MG provided a feasibility level budget for installing an
alternate tailings handling system at the Wolverine mine in
Tumbler Ridge.
____________________________________________________________________________________________
PROJECT ENGINEERING ASSISTANCE 2005
(Pipeline Systems Incorporated - Concord, California)
MG has provided mechanical engineering and design assistance to
PSI on a number of their projects.
____________________________________________________________________________________________
GALORE CREEK CONCENTRATE PIPELINE 2005
(Nova Gold Resources Inc - Northern BC)
Located in northwestern British Columbia, Galore Creek is one of the largest undeveloped copper-gold-silver projects worldwide. Novagold has proposed the installation of a slurry pipeline to transport 2000 tonnes per day of copper concentrate in an 8” by 135 km lined pipeline.
Read more
___________________________________________________________________________________________

CITY WATER REDUCTION 2005
(Canexus Chemicals Canada LP - North Vancouver, BC)
MG provided process engineering and detailed design for the
project to reduce city water usage.
Read more
___________________________________________________________________________________________
SHUTDOWN ASSISTANCE 2005
(Canexus Chemicals Canada LP - North Vancouver, BC)
MG provided field engineering for Canexus Chemical's annual
shutdown.
____________________________________________________________________________________________
HCL LOADING 2005
(Canexus Chemicals Canada LP - North Vancouver, BC)
MG provided the process engineering and detailed design for the
upgrading of the Hydrochloric Acid Loading system.
____________________________________________________________________________________________

SECURITY VULNERABILITY ANALYSIS 2005
(Canexus Chemicals Canada LP - North Vancouver, BC)
MG provided the detailed design engineering for the new Gate
House, Parking Lot and Security systems.
Read more
____________________________________________________________________________________________
CAUSTIC RAILCAR UNLOADING 2004
(Canexus Chemicals Canada LP - North Vancouver, BC)
MG provided conceptual design assistance.
____________________________________________________________________________________________
HCL SCRUBBER SUPPORT 2004
(Canexus Chemicals Canada LP - North Vancouver, BC)
MG provided structural engineering for a new Hydrochloric Acid
Scrubber.
____________________________________________________________________________________________
CAUSTIC TANK CONTAINMENT 2004
(Canexus Chemicals Canada LP - North Vancouver, BC)
MG provided budgeting assistance for proposed new Caustic Tank
Containment system.
____________________________________________________________________________________________
CATHODE WASH BAY UPGRADE 2004
(Canexus Chemicals Canada LP - North Vancouver, BC)
MG provided preliminary engineering and budget development for
modernizing the Cathode Wash Bay.
____________________________________________________________________________________________
|
|
|
|
|