Bus Bar Seismic Restraint 2010

(Canexus Chemicals, North Vancouver, BC)

MG completed the detailed design for the bus bar seismic restraints for the Canexus TCP project in North
Vancouver. The restraints consisted of cables with insulators, and rigid supports where cables could not be
placed on both sides.
____________________________________________________________________________________________

HCl Storage Scrubber UPgrade 2010

(Canexus Chemicals - North Vancouver, BC)

MG completed detailed design for the installation of 2 Fume Scrubbers and related piping. The objective of this
project was to was to provide provide continuous scrubbing ability for their (4) HCl Storage Tanks & Truck
Loading Station by installing 2 fume scrubbers and a three way valve switching station.
____________________________________________________________________________________________

Standby Pumps Installation 2010

(Canexus Chemicals - North Vancouver, BC)

MG completed detailed design for the installation of 12 standby pumps, related piping, pipe bridge and equipment
 pads. The objective of this project was to provide continuous pumping due to pump failure,
____________________________________________________________________________________________

Erco Feed Back-UP System 2010

(Canexus Chemicals - North Vancouver, BC)

MG completed detailed design for the installation of the Erco Feed Back-Up System. The objective of this project
was to was to provide the adjacent Sodium Chlorate Plant filtered brine, while Canexus in their annual
maintenance shutdown. The project included the installation of a pump, related piping, pipe bridge and equipment pad.
____________________________________________________________________________________________

Modification to Caustic Railcar Loading Ramps 2010

(Canexus Chemicals - North Vancouver, BC)

MG completed detailed design for widening the Caustic Railcar Loading Ramps. The objective of this project was to
improve the loading at (3) Caustic Railcar loading stations. The project included installing (3) 4 feet wide ramps,
modifying platform steel and piping.
____________________________________________________________________________________________

Hydrogen Analyzer Re-Deployment 2010

(Canexus Chemicals - North Vancouver, BC)

MG completed detailed design for installation of the Hydrogen Analyzer Re-deployment The objective of this
project was to provide continuous sampling of the chlorine off gas for presence of hydrogen from the Electroylzers.
The project included the installation of (14) titanium sample coolers, relocating (7) pressure gauges, installing
sample tubing, and instrument air for sample cooling.
____________________________________________________________________________________________

Plant Drainage 2010

(Canexus Chemicals - North Vancouver, BC)

MG completed detailed design and assisted with construction for Plant Drainage in between the Cell Room and the
Brine Area. The objective of this project was to improve drainage of rain water.
____________________________________________________________________________________________

Canexus Salt Pad Project 2010

(Canexus Chemicals - North Vancouver, BC)

MG completed the detailed design and assisted the Canexus Plant in North Vancouver with construction
management of the first phase of the expansion of their raw salt storage capacity. This project consisted of
installing new ‘lock block’ retaining walls on the south and east sides of the salt pad. The lock blocks were tied in
to existing walls with short sections of new cast in place concrete retaining walls. The project also included some
demolition of existing structures and piping, some new piping, platform re-design, a drainage system, fence
relocation, asphalt paving, and the installation of a new power pole.
____________________________________________________________________________________________


Caustic Railcar Loading Automation 2009

(Canexus Chemicals - North Vancouver, BC)

MG completed detailed design for the Caustic Railcar Loading Automation. The objective of this project was to
improve Caustic Railcar Loading. The Project included installing two mag meters and three automatic on/off
valves and related piping.
____________________________________________________________________________________________

FLY ASH HANDLING PROJECT 2009

(Capital Power Corporation - Williams Lake Power Plant, BC)

MG Engineering was hired by Capital Power Corporation (CPC) to study options to improve/replace the current
problematic fly ash handling system at the Williams Lake Power Plant.

Read more
____________________________________________________________________________________________

AMBATOVY ORE SLURRY PIPELINE 2008

(Ambatovy Minerals, SA - Madagascar)

MG acted as a subcontractor to PSI Inc., (Concord, CA.) to provide civil/structural design services for this large
42m x65m pump station in Madagascar .

Read more

____________________________________________________________________________________________

PERSEVERANCE

(Xstrata - Matagami, Quebec)

MG acted as subcontractor to PSI Inc. (Concord, CA.) to provide hydraulic, civil and mechanical design .

Read more
____________________________________________________________________________________________

PIPELINES 2008

(Galore Creek Mining Corporation (Galore Creek Projects) - Vancouver, BC)

MG assisted PSI with a conceptual study for new options for the mine. Previously, MG assisted PSI with the
preliminary design of the diesel supply, mine concentrate, tailings and ore pipelines.
____________________________________________________________________________________________

HYDROCHLORIC RAILCAR ACID LOADING FACILITY 2008
(Canexus Chemicals Canada LP - North Vancouver, BC)

The acid railcar loading project consisted of the design and installation of a new stand-alone railcar loading platform, located to the north of the existing loading bays. The project included a siding extension to the south, which combined with the new loading station, allows increased caustic and acid railcar loading capabilities.

Read more
___________________________________________________________________________________________

TAILINGS LINES 2007

(Agnico - Eagle Mines Limited (Goldex Project) - Val-D'or, Quebec)

MG is assisting PSI in the preliminary and detailed design of a 5 kilometre and 20 kilometre tailings system for
the Goldex Mine in North-western Quebec. 
____________________________________________________________________________________________

STRIPPER HEAT RECOVERY 2007

(Canexus Chemicals - North Vancouver, BC)

MG completed the detailed mechanical and structural design for the heat exchanger installations on this project. 
____________________________________________________________________________________________

PEAT DEWATERING 2007
(Barrick Gold/ Westmar - Alaska, USA)

This project involved budget development work for a proposed gold mine in a remote area of Alaska. The mine location was distant from power utilities, oil pipelines and other possible sources of energy.

Read more
____________________________________________________________________________________________

ALUMINA CONCENTRATE PIPELINE STUDY 2006

(PSI / Bechtel Corporation - Brisbane, Australia)

MG participated in a preliminary engineering study estimating the cost of a 400 kilometre alumina concentrate
pipeline in South East Asia.
____________________________________________________________________________________________

ALTERNATE TAILINGS HANDLING STUDY 2006

(Western Canadian Coal Company - Tumbler Ridge, BC)

MG provided a feasibility level budget for installing an alternate tailings handling system at the Wolverine mine in
Tumbler Ridge.
____________________________________________________________________________________________

PROJECT ENGINEERING ASSISTANCE 2005

(Pipeline Systems Incorporated - Concord, California)

MG has provided mechanical engineering and design assistance to PSI on a number of their projects.
____________________________________________________________________________________________

GALORE CREEK CONCENTRATE PIPELINE 2005

(Nova Gold Resources Inc - Northern BC)

Located in northwestern British Columbia, Galore Creek is one of the largest undeveloped copper-gold-silver projects worldwide. Novagold has proposed the installation of a slurry pipeline to transport 2000 tonnes per day of copper concentrate in an 8” by 135 km lined pipeline.

Read more
___________________________________________________________________________________________

CITY WATER REDUCTION 2005
(Canexus Chemicals Canada LP - North Vancouver, BC)

MG provided process engineering and detailed design for the project to reduce city water usage. 
   
Read more
___________________________________________________________________________________________


SHUTDOWN ASSISTANCE 2005

(Canexus Chemicals Canada LP - North Vancouver, BC)

MG provided field engineering for Canexus Chemical's annual shutdown.
____________________________________________________________________________________________

HCL LOADING 2005

(Canexus Chemicals Canada LP - North Vancouver, BC)

MG provided the process engineering and detailed design for the upgrading of the Hydrochloric Acid Loading 
system.
____________________________________________________________________________________________

SECURITY VULNERABILITY ANALYSIS 2005
(Canexus Chemicals Canada LP - North Vancouver, BC)

MG provided the detailed design engineering for the new Gate House, Parking Lot and Security systems.

Read more
____________________________________________________________________________________________


CAUSTIC RAILCAR UNLOADING 2004

(Canexus Chemicals Canada LP - North Vancouver, BC)

MG provided conceptual design assistance.
____________________________________________________________________________________________

HCL SCRUBBER SUPPORT 2004
(Canexus Chemicals Canada LP - North Vancouver, BC)

MG provided structural engineering for a new Hydrochloric Acid Scrubber.  
____________________________________________________________________________________________

CAUSTIC TANK CONTAINMENT 2004

(Canexus Chemicals Canada LP - North Vancouver, BC)

MG provided budgeting assistance for proposed new Caustic Tank Containment system.
____________________________________________________________________________________________

CATHODE WASH BAY UPGRADE 2004

(Canexus Chemicals Canada LP - North Vancouver, BC)

MG provided preliminary engineering and budget development for modernizing the Cathode Wash Bay. 