MG Engineering Inc. (MG) is a Multi-Disciplinary
Engineering Design Company which has been operating
internationally since 2002.
Below is a list of MG Engineering Pulp & Paper Projects.
|
____________________________________________________________________________________________
DISPERSED AIR SYSTEM 2010
(Alberta Newsprint - Whitecourt, Alberta)
MG Engineering provided mechanical and civil engineering services for the detailed engineering of the Dispersed Air System at Alberta Newsprint.
Read more
____________________________________________________________________________________________
TWO STAGE OXYGEN DELIGNIFICATION 2010
(Cascade Pacific Pulp - Halsey, Oregon)
This project involved the budget preparation, detailed design, procurement, and construction f
or the addition of a second reactor to the mills existing Oxygen Delignification System.
Read more
____________________________________________________________________________________________
EVAPORATORS EFFECT REBUILD 2010
(Howe Sound Pulp & Paper - Port Mellon, BC)
MG Engineering provided construction management services for the rebuild of the HSPP Evaporators Effect #1.
Read more
____________________________________________________________________________________________
CORE CUTTING 2009
(Alberta Newsprint Company - Whitecourt, Alberta)
MG Engineering provided detailed Structural and Mechanical design and construction supervision for an automated Core Cutting system in the Alberta Newsprint Mill in Whitecourt Alberta.
Read more
____________________________________________________________________________________________
ENGINEERING ASSISTANCE FOR DEMOLITION 2008
(Catalyst Paper Incorporated - Port Alberni, BC)
MG provided engineering assistance for the demolition of a portion of the old steam plant at the Catalyst Mill in
Port Alberni.
Read more ____________________________________________________________________________________________

BLEACH PLANT PRESSATE COOLING 2007
(Catalyst Paper Corporation - Powell River, BC)
This project involved relocating two obsolete shell and tube heat exchangers removed from the shut down kraft mill, and an automatic water filter removed from the upper floor of the old groundwood screen room.
Read more
____________________________________________________________________________________________

MICROPARTICLE SYSTEM 2007
(Alberta Newsprint Company - Whitecourt, Alberta)
This microparticle project consisted of the design and installation of a Starch and Silica system to improve Newsprint paper quality, by increasing sheet strength and smoothness for better printing properties.
Read more
____________________________________________________________________________________________
STARCH SYSTEM INSTALLATION 2007
(Catalyst Paper Corporation - Powell River, BC)
MG provided the structural design services for the Starch System
installation.
____________________________________________________________________________________________
STARCH TO NO.11 PAPER MACHINE 2007
(Catalyst Paper Corporation - Powell River, BC)
This project involved installing a new starch pump from the PM 10 Cooked Starch Paste Tank, and a dedicated starch pipeline from the new pump discharge to No. 11 Paper Machine. An existing pump pad from the original starch system project was utilized for the new pump.
Read more
____________________________________________________________________________________________
BUDGET AUDIT 2007
(CANFOR Pulp and Paper (Northwood Mill) - Prince George, BC)
MG conducted a process and budget audit on the evaporator
expansion project.
____________________________________________________________________________________________
SITE ENGINEERING ASSISTANCE 2006/2007
(Alberta Newsprint Company - Whitecourt, Alberta)
MG provided field engineering and design assistance to Alberta
Newsprint Company on a continuous basis during
2006/2007.
____________________________________________________________________________________________
SHUTDOWN ENGINEERING ASSISTANCE
2006/2007
(Howe Sound Pulp and Paper - Port Mellon, BC)
MG provided on site field engineering and design assistance
during HSPP annual kraft mill maintenance shutdowns.
____________________________________________________________________________________________
DOWNFLOW COOKING PIPING DESIGN 2006
(Howe Sound Pulp and Paper - Port Mellon, BC)
MG completed the detailed piping design and field engineering
for this job.
____________________________________________________________________________________________
RECAUSTICIZING/KILN AUDIT ASSISTANCE
2006
(Pope & Talbot Inc. - Halsey, Harmac, Mackenzie)
MG assisted mill audit teams from Pope & Talbot's 3 kraft mills
to complete internal audits.
____________________________________________________________________________________________
DUST COLLECTION SYSTEM 2006
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG completed detailed Civil/Structural design for the Hog Fuel
dust collection system.
____________________________________________________________________________________________
WOOD DUST CONTROL STUDY 2006
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG provided process engineering and estimating assistance to
develop a plan to handle wood dust at the Caribou
mill in Quesnel to deal with the increased dust levels caused by the
beetle killed wood.
____________________________________________________________________________________________
SECOND REWINDER 2006
(Alberta Newsprint Company - Whitecourt, Alberta)
MG provided engineering design and estimating assistance in a
study to add a second rewinder to the newsprint
mill.
____________________________________________________________________________________________

BOILER FEEDWATER TREATMENT SYSTEM 2006
(Alberta Newsprint Company - Whitecourt, Alberta)
ANC was experiencing problems with scale and mineral build up in the Feed water system for the Re-boilers. A GE Reverse Osmosis Filter system was chosen to treat the Feed water, providing 300 gpm of clean water to the Reboilers.
Read more
____________________________________________________________________________________________
#1 CHIP SILO UPGRADE 2006
(Catalyst Paper Corporation - Powell River, BC)
MG completed the detailed design work for a new silo discharge
system.
____________________________________________________________________________________________

DEMINERALIZER PLANT 2006
(Catalyst Paper Corporation - Port Alberni, BC)
MG provided civil and structural design services and detailing
for the Demineralizer Plant project.
Read more
____________________________________________________________________________________________
REPULPER FLOOR STEEL REPAIR 2006
(Catalyst Paper Corporation - Port Alberni, BC)
MG provided structural design and detailing services for the
Repulper Floor Steel Repair, and the Paper Machines
Access Stair
projects.
____________________________________________________________________________________________
ENGINEERING ASSISTANCE 2004 - 2006
(Howe Sound Pulp and Paper Limited Partnership - Port Mellon,
BC)
MG has provided engineering and design assistance on a number of
mill projects on an ongoing basis.
____________________________________________________________________________________________

HVLC SCRUBBING 2005
(Pope & Talbot, Inc. - Halsey, Oregon)
MG provided multi-disciplinary engineering for cold water
scrubbing of the gas from the Brownstock Washing and Screening
areas, and from the Oxygen Delignification system, for methanol
removal.
Read more
____________________________________________________________________________________________

THIRD STAGE TOWER 2005
(Pope & Talbot, Inc. - Halsey, Oregon)
MG provided all engineering, from process to field engineering,
for the new Chlorine Dioxide Bleaching Tower.
Read more
____________________________________________________________________________________________
HALSEY MILL CAPACITY INCREASE STUDY
2005
(Pope & Talbot, Inc. - Halsey, Oregon)
MG provided process development and preliminary budgeting for a
study to increase the capacity of the Halsey
Mill by 50
tons/day.
____________________________________________________________________________________________
RECOVERY BOILER MODIFICATIONS 2005
(Pope & Talbot, Inc. - Halsey, Oregon)
MG prepared as Appropriation Grade Budget for de-bottlenecking
the Halsey Mill's Recovery Boiler.
____________________________________________________________________________________________
PULP MACHINE AUDITS 2005
(Pope & Talbot, Inc. - Halsey, Oregon; MacKenzie, BC; Harmac,
BC)
MG aided a team of engineers from the three mills in conducting
an audit of the Company's five Pulp Machines.
____________________________________________________________________________________________
RECOVERY BOILER BLAST WALL 2005
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG provided the detailed engineering for the Blast Wall for the
Recovery Boiler control room.
____________________________________________________________________________________________
MILL STEEL INSPECTION 2005
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG developed a detailed report on the condition of the
structural steel at the Mill site with a detailed plan for
maintaining it.
____________________________________________________________________________________________
OIL STORAGE 2005
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG provided the design and construction supervision for a new
Oil Storage Facility.
____________________________________________________________________________________________
CHIP TESTING LAB 2005
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG provided the design and construction supervision for the new
Chip Testing Lab.
____________________________________________________________________________________________
GARAGE REDESIGN 2005
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG provided the design and construction supervision for the
modifications to the Mill's Heavy Equipment Garage.
____________________________________________________________________________________________
SWING CLARIFIER 2005
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG provided the process design and preliminary detailed
engineering to provide the Mill with a spare Green Liquor
Clarifier and Mud Washer.
____________________________________________________________________________________________
KAMYR DIGESTER EXTRACTION PIPING
MODIFICATIONS 2005
(Western Pulp Ltd. - Squamish, BC)
MG completed the detailed design for modifications to existing
Kamyr Digester extraction piping.
____________________________________________________________________________________________
PULP MACHINE DRYER CONDENSATE PIPING
2005
(Western Pulp Ltd. - Squamish, BC)
MG redesigned the cylinder dryer condensate piping to eliminate
chronic leaking problems.
____________________________________________________________________________________________
BLEACH PLANT PIPING 2005
(Western Pulp Ltd. - Squamish, BC)
MG designed new sections of stock line and chlorine dioxide
piping to improve K number control.
____________________________________________________________________________________________
KRAFT HOT WATER SYSTEM INSTALLATION
2005
(Catalyst Paper Corporation - Campbell River, BC)
MG provided structural design for the Kraft Hot Water System
project.
____________________________________________________________________________________________
FUEL OIL LINE PIPE BRIDGE 2005
(Catalyst Paper Corporation - Campbell River, BC)
MG provided structural design and detailing services for the
Fuel Oil Line Pipe Bridge project.
____________________________________________________________________________________________
SPENT ACID SYSTEMS MODIFICATIONS 2004
(Pope & Talbot, Inc. - Halsey, Oregon)
MG provided process engineering, budget development, and
preliminary engineering for modifying the Mill's Spent
Acid
Handling system.
____________________________________________________________________________________________

STEAM CONTROL / HOG CONDITIONING 2004
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG provided preliminary and detailed engineering for the Steam
Header Control / Hog Fuel Conditioning system and the
modifications to the Mill's Power Boiler.
Read more
____________________________________________________________________________________________
PULP DRYER BOOSTER FAN 2004
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG provided the detailed engineering for the new Fan.
____________________________________________________________________________________________
SECONDARY KNOTTER 2004
(Cariboo Pulp & Paper Company - Quesnel, BC)
MG completed the budget and preliminary engineering for a new
Secondary Knotter.
____________________________________________________________________________________________
#10 & #11 WINDER RESCUE DEVICES 2004
(Catalyst Paper Corporation - Powell River, BC)
MG provided structural design and detailing services for the
No.10 & 11 Winder Rescue Devices.
____________________________________________________________________________________________
#9 PAPER MACHINE UNWIND UPGRADE 2003
(Catalyst Paper Corporation - Powell River, BC)
MG provided structural engineering services for the No.9 PM
Unwind Upgrade.
____________________________________________________________________________________________

BIOMASS UTILIZATION 2003
(Sechelt Creek Contracting - Twin Creeks, BC)
MG provided process engineering, project budgeting, and
preliminary detailed engineering for a Chipping Plant at the
Twin Creeks site.
Read more
____________________________________________________________________________________________
MACHINE ROOM AREA LIFTING DEVICES 2003
(Catalyst Paper Corporation - Powell River, BC)
MG provided structural analysis and load rating for a series of
lifting devices in the Paper Machines area.
____________________________________________________________________________________________

SLUDGE DEWATERING ODOUR CONTROL 2002
(Catalyst Paper Corporation - Powell River, BC)
MG provided process engineering, detailed design and field
engineering for modifications to the Mill's Sludge Handling
Process.
Read more
____________________________________________________________________________________________

PULP WAREHOUSE EXPANSION 2002
(Catalyst Paper Corporation - Powell River, BC)
MG provided detailed design for the new apron and additions to
the Pulp Warehouse.
Read more
____________________________________________________________________________________________
|
|
|
|
|